Globe and Mail
351 King St E. Toronto, ON
17 Storeys
Developer: First Gulf
Architects: Diamond & Schmitt
Pro-Bel services provided: Design, Engineer, Manufacture, Supply and Install, Load Testing, and Inspection


Pro-Bel Technical Solution
We designed an extensive monorail system to service the complicated façade of the building. Several monorails are fitted on levels 6 through 17 on all four sides of the building to ensure safe access beneath overhangs created by the asymmetrically stacked building sections/ blocks. The southwestern corner is serviced by a custom wall mounted rolling davit arm system. The system consists of two roof-rigged davit arms that are equipped with electrical/mechanical mechanisms to traverse the platform (swing stage) suspended from the roof rigged davits horizontally along the corner of the roof. The remaining sections of the Globe and Mail Centre are serviced by a combination system of davits and roof anchors. Horizontal lifeline (cable) systems provide access to hazard areas where our equipment is located and/or other maintenance is required. Intermittent Stabilization Anchors (ISAs / stabilization buttons) are located on the facade with varying placement depending on each section/block of the building.

















































