Amber Condos
5025-5033 Four Springs Ave. Mississauga
23 & 26 Storey Towers
General Contractor: Pinnacle Int'l
Architect: Turner Fleischer
Pro-Bel services provided: Design, Engineer, Manufacture, Supply and Install

Pro-Bel Technical Solution
Our team designed a davit system for both towers to ensure the suspended platform can reach past the protruding balconies. For separate and independent tie off we designed a separate anchor system for workers’ lifelines; which then required the provision of portable line redirectors for the highest balconies on each side of the towers.
Line redirectors simply ensure the lifeline (safety line) is not resting on the balcony and potentially causing structural damage. The areas of the buildings with no balconies only require bosun’s chair work, so they are serviced with simple safety anchors.
Finally, intermittent stabilization anchors (ISAs / stabilization buttons) are installed on the façade to ensure safe vertical travel. Workers simply connect to these buttons to stabilize themselves as they perform suspended platform work stabilization for a boson chair can be completed using suction cups.

















































